Iberdrola has installed a micro grid facility in the Campus of San Agustín, composed of 3 Li-ion batteries of 170kW/250kWh, several photovoltaic plants, a Building Management System, EV charging points and wind generation.

This project is focused on the interaction between the dispatching centre and distributed energy resources. The first objective was to adapt the distribution management system. The DSO will have to be able to operate the grid, enabling all these elements connected to the grid or temporarily off-grid, and the systems must be ready for that. Coordinated operation of several storage systems to provide services to the grid has also been tested.

All MEMBERS

    1. Energy Transition 2.0 Europe

      April 29
    2. European Electric Vehicle Batteries Summit

      June 3 - June 4
    3. 2nd Annual Europe Solar + Energy Storage Congress (ESES)

      June 23 - June 24
    4. International Flow Battery Forum

      June 30 - July 2
    5. Energy Storage and Battery Solutions for Energy Sector 2020

      September 16 - September 18

    SEE MORE PUBLICATIONS